Oupu Yuba wiring method Oupu Yuba installation precautions

With the continuous improvement of people's economic level, Yuba has gradually entered millions of households, it can make us feel warm in the cold winter. So, how does the Yuba connect it? What are its installation precautions? Let Xiaobian introduce the connection methods for Oupu and its installation precautions.

One, Oupu Yuba wiring method

1. First of all, we need to open the ventilation holes when installing Op Yuba, and select the orientation of the ventilation holes on the wall. This position must be avoided not only above the ceiling but also below the outlet of the centrifugal fan casing of the appliance. The water droplets in the vent pipe flow back into the appliance and open a round hole in this position.

2. After we have finished the ventilation holes, we can install ventilation windows. First, put one side of the ventilation pipe into the ventilation window, and then fix the other side of the ventilation window at the outlet of the exterior wall. Use cement to place the ventilation pipe. Fill the gap with the vent hole.

3, choose a good position to install Yuba, want to achieve better heating effect, Yuba's installation position is best selected in the center of the bathroom. The choice of ceiling material is better. After installation, the height of the bulb from the ground should be between 2.1-2.3M. Too high or too low will affect the use of results.

4. Since the 30×40MM wood file is used to install the keel when laying, we need to leave the hole size when connecting the bath heater. The height of the sandwich space caused by the ceiling and the top of the house should not be lower than 220mm. According to the size of the cabinet itself, a square hole of the same size is cut on the installation position of the product on the ceiling, and the distance between the edge of the square hole and the wall may not be lower than 250 mm.

5, the next step is to fix the bathroom heater, remove the mask, and unscrew all the bulbs, and remove the spring from the ring of the mask and remove the mask.

6. Connect one side of the cord to the switch panel, pull the other end of the cord together with the power cable from the opening in the top, and connect the terminal cover on the box with the terminal cover, and fix the terminal cover with screws. Then insert the excess wire into the ceiling so that the box can be inserted into the hole.

Second, Oupu Yuba wiring method - Oupu Yuba installation precautions

When we install Yuba, we must select the person's standing position in the bathroom, preferably on the back of the human body. This is because the heat of the bath heater not only heats the air in the bathroom, but also directly radiates heat to the back of the human body.

The above is all about the Opbus wiring method and its installation precautions. I hope to help everyone. If you want to know more relevant knowledge, you can continue to pay attention to the relevant information of this website. Xiao Bian will bring more exciting content for everyone.

API 6D Trunnion Mounted Ball Valve

API 6D trunnion mounted ball valve, cast steel WCB trunnion mounted ball valve, LCB trunnion mounted ball valve, CF8 trunnion mounted ball valve, CF8M trunnion mounted ball valve, 3pcs body trunnion mounted ball valve, side entry trunnion mounted ball valve, top entry trunnion mounted ball valve, forged steel A105 trunnion mounted ball valve, LF2 trunnion mounted ball valve, F304 trunnion mounted ball valve, F316 trunnion mounted ball valve, F316L trunnion mounted ball valve, F51 trunnion mounted ball valve, soft seat trunnion mounted ball valve, metal to metal seat trunnion mounted ball valve, seat pocket clading trunnion mounted ball valve, gear operated trunnion mounted ball valve. fire safety trunnion mounted ball valve, NACE MR 01-75 trunnion mounted ball valve, trunnion mounted Ball Valve Components

Trunnion Ball Valve,Trunnion Valve,Trunnion Mounted Valve,Trunnion Type Ball Valve

SUZHOU RSF VALVE CO.,LTD , https://www.rsf-valve.com